Skip to content
Agentmart
Submit a tool

ba-post-implementation

BA Phase 5 — post-implementation completeness verification (UI tasks).

Skill by evolplus

IndexedApache-2.0★ 8
Write a review

Chalk Labs

Need help deploying ba-post-implementation?

Chalk Labs sets up agents like this inside real teams: connected to your tools, tested on your data, with a human in the loop where it matters.

Book a call

Install

Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.

npx agentmarket install skill/evolplus-ba-post-implementation

Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.

Get the weekly diff

The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.

We use your email only for this newsletter. Privacy

About

BA Phase 5 — post-implementation completeness verification (UI tasks). Load when dispatched with mode: post-implementation after FE Dev proposes to_status: ready-for-deploy for a UI-bearing task. Cross-references the design-confirmed handoff + task DoD against the FE Dev git diff (and deployed bundle when present) and emits docs/uiux/post-implementation-reports/<task-id>.md with a qualified/unqualified verdict.

Use cases: design, devops, productivity

No reviews yet. Installed it? Reviews come from verified installers only. How reviews work

Permissions

What this skill can do and what it asks for, from its SKILL.md and code. Checked Oct 25, 2026.

Tools
No tools found
Secrets
None asked for
Install scripts
None found

Network hosts it talks to 1

  • codeload.github.com · found in install command

Files it touches

  • ~/.claude/skills/ba-post-implementation

What's inside

Skill name
ba-post-implementation
Description
BA Phase 5 — post-implementation completeness verification (UI tasks). Load when dispatched with mode: post-implementation after FE Dev proposes to_status: ready-for-deploy for a UI-bearing task. Cross-references the design-confirmed handoff + task DoD against the FE Dev git diff (and deployed bundle when present) and emits docs/uiux/post-implementation-reports/<task-id>.md with a qualified/unqualified verdict.
License
Apache-2.0
Instructions
69 lines in SKILL.md · view on GitHub

Files (1)

  • SKILL.md

SKILL.md (first lines)

# BA Phase 5 — Post-Implementation Completeness Verification

## When to use

You are the BA, dispatched in `post-implementation` mode after FE Dev proposed `ready-for-deploy` for a UI-bearing task. Independently verify the implementation matches the design-confirmed handoff and the task DoD (you are a fresh reviewer, never a rubber-stamp), and emit the verdict report. Mirrors Phase 3 but operates on the implementation diff.

### Phase 5 — Post-Implementation Completeness Verification (UI tasks)

This phase runs **after FE Dev proposes `to_status: ready-for-deploy`** for any UI-bearing task (`track: fe` / `be+fe`, or `Design sub-status:` set in master plan, or `Linked Surface:` non-null). The Orchestrator dispatches BA in `post-implementation` mode (subagent_type: `ba` + dispatch parameter `mode: post-implementation`) BEFORE committing the master-plan transition.

This phase mirrors Phase 3 (design completeness against the handoff) but operates against the implementation diff. Phase 3 asks "is the design complete?"; Phase 5 asks "is the implementation complete?" Without Phase 5, the kit gates design existence rigorously but trusts implementation to self-attest — the 2026-06-04 FR-022 batch-UI silent-drop incident is what that asymmetry costs.

#### Trigger

- FE Dev has emitted `plan-update.json` proposing `to_status: ready-for-deploy` for a UI-bearing task.
- The `ui-task-readiness-guard.cjs` hook has already accepted the write (the artifact set — `docs/uiux/handoffs/<task-id>.md`, `docs/uiux/refs/<task-id>.md`, `docs/uiux/visual-specs/<task-id>.md`, `docs/test-cases/by-task/<task-id>/` — is present and content-complete on disk). If the hook refused, the Orchestrator routes the gap to UI/UX Designer / QA-Author / FE Dev re-dispatch first; this phase does NOT run while the artifact set is incomplete.
- The Orchestrator dispatches you with: `task_id`, the FE Dev worktree path (`.worktrees/fe-dev-<task-id>/`), and a copy of the FE Dev `plan-update.json` (notes + DoD-scope justifications).

#### Procedure

1. **Read the design-confirmed handoff and FE refs.** Open `docs/uiux/handoffs/<task-id>.md`, `docs/uiux/refs/<task-id>.md`, and `docs/uiux/visual-specs/<task-id>.md`. Build the implementation expectation list: every screen, every component, every state, every interaction, every confirm-dialog / toast / modal, every Reference Render, every Visual Composition Contract row, every Asset Export Manifest row, and every Design Element Manifest / assertion row.

2. **Read the task DoD.** Open `docs/plan/<phase>/tasks/<task-id>.md`. Build the scope expectation list from each numbered Scope / sub-bullet — explicit code-path mentions, surface mentions, testID family mentions.

3. **Compute the implementation diff.** Run `git diff main..HEAD` against the FE Dev worktree. Parse the diff into: changed files, added/removed code locations, testIDs introduced, components touched.

4. **Cross-reference each expectation against the diff.**
   - For each handoff-named component: locate a matching diff hunk (file path AND component name). Missing match = gap.
   - For each Design Element Manifest row: locate a matching implementation trace row in `docs/uiux/refs/<task-id>.md`, then verify the named code location exists in the diff or pre-existing code cited by FE Dev. Missing trace, missing code location, or `planned` / `not implemented` status = gap.
   - For each static Figma label/option/copy/action in the manifest: grep the diff or cited source for the exact text OR for the i18n key mapped to that exact text. Missing exact copy/key = gap.
   - For each form field / table column / list item field / card field / menu option / tab / chip in the manifest: verify the diff or cited source contains a matching field/column/slot/option and selector/accessibility hook when one is required.
   - For each DoD-scope code-path mention: locate a matching diff hunk. Missing match = gap (unless FE Dev's `plan-update.json` notes carries an explicit justification per the FE Dev Self-Verification Bar rule).
   - For each testID family declared in `docs/instrumentation-contract.md` for the surface: grep the diff for at least one occurrence. Zero occurrences for a family = gap.
   - For each Asset Export Manifest row: verify the exported file exists at the traced path, code imports/uses it, and the implementation preserves declared semantics and rendering behavior. Placeholder text/emoji/generic glyphs, invented gradients, stock images, or missing imports are gaps.
   - For each Visual Composition Contract row: verify the cited layout code implements the contracted major regions, direct-child order, constraints, clipping/masks, responsive variant, and background treatment. A generic layout with the right child components is still a gap.
   - For each Reference Render: require implementation screenshot evidence at the same viewport/state. For Visual-Critical surfaces, require the approved-baseline visual-diff result; absence or failure is a gap.

5. **Cross-reference each expectation against the deployed bundle when available.** If a deploy report exists for the task at `docs/deploy-reports/<task-id>.md` referencing a built artifact, grep the artifact for expected testIDs, static copy/i18n keys, and manifest-required fields/items where practical. (Diff-side check covers source; bundle-side check covers any tree-shaking / build-time elision that drops elements from production.)

6. **Compose the verdict.**
   - **`qualified`** — every handoff-named element, asset, composition row, Design Element Manifest row, assertion, and DoD scope is represented in the diff/source (or explicitly justified where allowed). Every contract-declared testID family appears in the diff or bundle, and required visual comparison evidence passes.
   - **`unqualified`** — one or more gaps. Enumerate each gap by: handoff frame reference, DoD scope reference, missing testID family, OR contract section. Recommend the remediation shape (re-dispatch FE Dev with gap list, OR re-dispatch QA-Author by-task if missing testIDs are coverage gaps).

#### Output

Produce `docs/uiux/post-implementation-reports/<task-id>.md`:

- Summary verdict: `qualified` or `unqualified`
- Per-expectation verdict with specifics for any gaps
- For `unqualified`: list every gap with handoff frame reference / Manifest ID / DoD scope reference / file-path expected vs file-path observed
- Recommended next step: `re-dispatch-fe-dev` (with gap list) or `re-dispatch-qa-author-by-task` (when missing coverage)
- For `qualified`: explicitly note "implementation matches design-confirmed handoff" so the next reader can audit the verdict

`plan-update.json` does NOT transition the master-plan task status. Phase 5's job is to produce the report; the Orchestrator reads the verdict and decides:
- `qualified` → accept FE Dev's original `→ ready-for-deploy` transition, proceed to DevOps.
- `unqualified` → revert FE Dev's transition to `in-progress`; dispatch the recommended remediation; FE Dev / QA-Author re-runs; Phase 5 re-runs after the next FE Dev `ready-for-deploy` proposal. Loop until `qualified`.

#### Hard Rules for Phase 5

- **Never produce `qualified` against an absent handoff.** If `docs/uiux/handoffs/<task-id>.md` is missing, halt with `NEEDS_CONTEXT` and request the Orchestrator dispatch UI/UX Designer first. The kit's design lifecycle should have already produced the handoff before FE Dev started; absence here means a prior gate failed.
- **Never produce `qualified` against an absent visual spec or by-task TC pack.** The `ui-task-readiness-guard.cjs` hook should have blocked the upstream `plan-update.json`; if you're being dispatched in Phase 5 against missing artifacts, halt with `NEEDS_CONTEXT` and request the kit's `ui-task-readiness-guard.cjs` enforcement be re-applied.
- **Never produce `qualified` when `docs/uiux/refs/<task-id>.md` lacks `## Design Element Manifest` or `## Implementation Trace Matrix`.** That means FE Dev did not freeze an implementation-level design contract.
- **Never produce `qualified` when reference-render, visual-composition, asset-export, or corresponding trace/assertion sections are missing or empty.** A screen can be functionally complete while still being the wrong design.
- **Never accept placeholders for required assets or generic layout resemblance.** Verify actual exported asset use and contracted composition, including decorative-but-rendered backgrounds and graphics.
- **Never collapse manifest rows into component-level acceptance.** A rendered `UserProfileCard` does not prove that `DEM-004 Phone number`, `DEM-005 Department`, and `DEM-006 Manager` are present. Verify each row.
- **Never invent justifications for missing diff coverage.** When a Scope has zero matching diff hunks AND FE Dev's `plan-update.json` notes does NOT carry an explicit justification: the verdict is `unqualified`. Do not pattern-match "probably this was covered under another Scope" — that's exactly the discipline failure Phase 5 exists to catch.
- **You are a fresh reviewer, not the FE Dev's editor.** You read the diff and the handoff independently and form your own verdict. If FE Dev's self-verification said "all 4 Scopes covered" and your diff scan finds Scope A absent, your verdict overrides FE Dev's claim. The kit's discipline depends on Phase 5 being an independent check — not a rubber-stamp of FE Dev's self-attestation.

From evolplus/talos, Apache-2.0.

More from evolplus/talos

Signals

Stars
8
Forks
0
Open issues
1
Last commit (this folder)
Jul 27, 2026 (3 months ago)
Last release
Oct 12, 2026 (19 days ago)

From GitHub (fetched Oct 24, 2026).

Details

License
Apache-2.0
First seen
Oct 24, 2026
Last checked
Oct 24, 2026

More from evolplus

Done for you

Rather not set it up yourself?

Chalk Labs scopes, builds and runs agents for your team: the task audit, the eval harness, the integrations and the weekly ops report. Fixed scope, priced before we start.

See how we build AI agents →Read the case studies

Chalk Labs is a two-founder AI and growth studio. We build AI agents, CRMs and MVPs for Web3 and AI companies, and have shipped 50+ product and token launches.

launches shipped
50+
launches shipped
media placements
500+
media placements
founders on every account
2
founders on every account

Press we've placed: Forbes · CoinDesk · Decrypt · Cointelegraph · The Block

Rahil Jain, Co-founder, Chalk Labs. Ex-Goldman Sachs engineer. You talk to the person who builds it.

Get ba-post-implementation running in your business

Tell us what you want to automate. A founder replies within one working day with a plan, not a pitch deck.

Goes to the Chalk Labs founders, not the newsletter. Privacy

Need help deploying ba-post-implementation?

CallGet help
Cite this page

ba-post-implementation skill. Agent Mart. https://agentmart.dev/skills/evolplus-ba-post-implementation (last updated 2026-10-24)