Skip to content
Agentmart
Submit a tool

biomass-gasifier-sizing

Quantitative sizing of a downdraft biomass gasifier for small-scale power (rice husk / wood chips, ~5-50 kWe).

Skill by pvbang

IndexedMIT
Write a review

Install

Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.

npx agentmarket install skill/pvbang-biomass-gasifier-sizing

Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.

Get the weekly diff

The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.

We use your email only for this newsletter. Privacy

About

Quantitative sizing of a downdraft biomass gasifier for small-scale power (rice husk / wood chips, ~5-50 kWe). Use for reactor throat/hearth diameters, hearth & throat load, air/fuel & equivalence ratio (ER), syngas LHV, cold-gas efficiency (CGE), fuel-rate ↔ electric-power chain, and sanity ranges. Triggers on "gasifier design", "khí hóa trấu/sinh khối", "throat diameter", "hearth load", "syngas LHV/ER/CGE", "biomass to electricity sizing".

Use cases: design

No reviews yet. Installed it? Reviews come from verified installers only. How reviews work

Permissions

What this skill can do and what it asks for, from its SKILL.md. Checked Oct 25, 2026.

Tools
No tools found
Secrets
None asked for
Install scripts
None found

Network hosts it talks to 1

  • codeload.github.com · found in install command

Files it touches

  • ~/.claude/skills/biomass-gasifier-sizing

What's inside

Skill name
biomass-gasifier-sizing
Description
Quantitative sizing of a downdraft biomass gasifier for small-scale power (rice husk / wood chips, ~5-50 kWe). Use for reactor throat/hearth diameters, hearth & throat load, air/fuel & equivalence ratio (ER), syngas LHV, cold-gas efficiency (CGE), fuel-rate ↔ electric-power chain, and sanity ranges. Triggers on "gasifier design", "khí hóa trấu/sinh khối", "throat diameter", "hearth load", "syngas LHV/ER/CGE", "biomass to electricity sizing".
License
MIT
Instructions
72 lines in SKILL.md · view on GitHub

Files (1)

  • SKILL.md

SKILL.md (first lines)

# Biomass Downdraft Gasifier Sizing (small-scale power)

Reference correlations for sizing an Imbert/downdraft gasifier and its power
chain. Use these to DERIVE numbers and to SANITY-CHECK any figure before trusting
it. Sources: Reed & Das, *Handbook of Biomass Downdraft Gasifier Engine Systems*
(SERI/1988); FAO Forestry Paper 72 (1986). All numbers below are order-of-magnitude
design ranges — cite the correlation you use and show the arithmetic.

## Power chain (work BACKWARD from the electric target)

```
P_electric = m_fuel · LHV_fuel · η_gasif(CGE) · η_engine · η_generator
```
Typical small-scale efficiencies (use, and state, your chosen values):
- CGE (cold-gas efficiency) η_gasif : 0.60–0.80  (rice husk trends LOW: high ash/silica)
- η_engine (syngas ICE, shaft)      : 0.25–0.32
- η_generator                       : 0.90–0.95
- Overall biomass→electric          : ~0.12–0.20 (so ~20 kWe needs ~100–170 kW_th fuel)

Rice husk LHV_fuel (dry) ≈ 13–15 MJ/kg (HHV ~15–16); as-received lower with moisture.
=> Fuel rate for 20 kWe is typically ~20–35 kg/h rice husk. If your model says far
   outside this, RE-CHECK before proceeding.

## Syngas properties (downdraft air-blown) — sanity ranges
- LHV_syngas : 4.5–6.0 MJ/Nm³   (below 4.5 = too much N2/incomplete; above 6 = suspect)
- ER (equivalence ratio, actual/stoichiometric air) : 0.25–0.35 (design ~0.3)
- Dry syngas vol%: CO 18–22, H2 12–18, CH4 1–3, CO2 10–14, N2 45–55
- Specific gas production ~2.0–2.5 Nm³ syngas per kg dry biomass

## Reactor sizing — the two loads that set the two diameters

**THROAT (the narrowest section) is sized by HEARTH LOAD B_h**, defined as the
gas throughput per unit throat area:
```
B_h = Q_syngas / A_throat      [Nm³ syngas / (h · cm²) ]   typical 0.3–0.9 (design ~0.7)
A_throat = Q_syngas / B_h  ;  d_throat = sqrt(4·A_throat/π)
```
For a 20–30 kWe unit this yields **d_throat ≈ 80–120 mm** (NOT hundreds of mm).
A throat of ~250–500 mm implies a 150–250 kWe machine — an order-of-magnitude error.

**The REACTOR BODY / fuel bed is sized by the Specific Gasification Rate SGR**,
the FUEL mass throughput per unit body cross-section:
```
SGR = m_fuel / A_body           [ kg biomass / (h · m²) ]  typical 100–300
A_body = m_fuel / SGR  ;  d_body = sqrt(4·A_body/π)
```
This gives the larger shell diameter (a few hundred mm).

⚠️ **The #1 mistake**: mixing these up — using SGR (a body correlation) to size the
throat, or taking `max(d_throat_bySGR, d_throat_byBh)`. They are DIFFERENT
quantities for DIFFERENT sections. Throat ← B_h. Body ← SGR. Keep them separate;
never `max()` them into one "throat".

Hearth/throat geometry (Imbert): hearth (widest of throat zone) d_hearth ≈ 1.5–2.5×
d_throat; nozzle plane above throat; N air nozzles (typically 5) of Ø ~8–12 mm sized
so nozzle exit velocity ≈ 30–35 m/s at design air flow.

## Materials & temperature (Vietnam-manufacturable)
- Oxidation/throat zone hits ~1000–1100 °C → liner in SS310S / SS309 (or castable
  refractory); shell CT3/Q235 with ceramic-fibre insulation. Rice-husk ash fusion
  ~1000 °C → keep throat T below ash-fusion to avoid slagging.

## Self-check checklist (run these before reporting a design)
1. Does the power chain close? P_elec back-calculated = target ±5%?
2. d_throat in 80–120 mm for ~20 kWe? If not, the throat correlation is wrong.
3. Throat sized by B_h, body by SGR — not swapped, not max()'d?
4. LHV 4.5–6, ER 0.25–0.35, CGE 0.6–0.8 — all in range and mutually consistent?
5. Every number appears with ONE value across all files (design basis = CAD = report)?
6. Energy balance uses an INDEPENDENT forward computation, not a rearrangement that
   is algebraically forced to close (tautology).

From pvbang/nexus, MIT.

Signals

Stars
0
Forks
0
Open issues
0
Last commit (this folder)
Jul 9, 2026 (3 months ago)

From GitHub (fetched Oct 24, 2026).

Details

License
MIT
First seen
Oct 24, 2026
Last checked
Oct 24, 2026

More from pvbang

Cite this page

biomass-gasifier-sizing skill. Agent Mart. https://agentmart.dev/skills/pvbang-biomass-gasifier-sizing (last updated 2026-10-24)