skill-cost-projections

Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns

Skill by mhdxbilal

IndexedMIT★ 1
Write a review

Chalk Labs

Need help deploying skill-cost-projections?

Chalk Labs sets up agents like this inside real teams: connected to your tools, tested on your data, with a human in the loop where it matters.

Book a call

Install

Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.

npx agentmarket install skill/mhdxbilal-skill-cost-projections

Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.

Get the weekly diff

The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.

We use your email only for this newsletter. Privacy

About

Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns

Use cases: productivity, finance

No reviews yet. Installed it? Reviews come from verified installers only. How reviews work

Permissions

What this skill can do and what it asks for, from its SKILL.md. Checked Oct 25, 2026.

Tools
No tools found
Secrets
None asked for
Install scripts
None found

Network hosts it talks to 1

  • codeload.github.com · found in install command

Files it touches

  • ~/.claude/skills/skill-cost-projections

What's inside

Skill name
skill-cost-projections
Description
Project remaining workflow cost from per-phase averages — warns on budget ceiling overruns
License
MIT
Instructions
213 lines in SKILL.md · view on GitHub

Files (1)

  • SKILL.md

SKILL.md (first lines)

# Cost Projections Skill

## Overview

Projects remaining workflow cost based on per-phase averages from completed work. Displays cost data in the HUD/statusline and warns when projected totals exceed a configured budget ceiling.

**Minimum data requirement:** Needs **2+ completed steps** before projecting. With fewer than 2 data points, the average is unreliable — display actual spend only and skip projection.

---

## Step 1: Collect Completed Phase Costs

Read cost data from `~/.claude-octopus/metrics/` or from metrics-tracker.sh output. Each completed phase/step should have an associated cost entry.

```bash
# Read metrics from the session metrics directory
METRICS_DIR="$HOME/.claude-octopus/metrics"
SESSION_METRICS="$METRICS_DIR/session-$(date +%Y%m%d).jsonl"

# Each line contains: {"phase": "discover", "cost": 0.42, "tokens_in": 12000, "tokens_out": 3400, "timestamp": "..."}
# Sum costs from completed steps
completed_costs=$(jq -s '[.[].cost]' "$SESSION_METRICS")
completed_count=$(jq -s 'length' "$SESSION_METRICS")
total_spent=$(jq -s '[.[].cost] | add' "$SESSION_METRICS")
```

**Data sources (in priority order):**
1. `~/.claude-octopus/metrics/session-*.jsonl` — structured per-phase cost entries
2. `metrics-tracker.sh` output — fallback for legacy sessions
3. HUD accumulated cost counters — last resort

If fewer than 2 completed steps are available, display only actual spend:
```
💰 Spent: $0.42 (1 step complete — need 2+ for projection)
```

---

## Step 2: Compute Average Cost Per Step

Calculate the mean cost across all completed steps.

```bash
avg_cost=$(echo "$total_spent / $completed_count" | bc -l)
```

**Formula:**
```
avg_cost = total_cost / completed_steps
```

**Example:** If 3 steps cost $0.30, $0.50, $0.40 → avg = $1.20 / 3 = $0.40/step

---

## Step 3: Project Remaining Cost

Multiply the average cost per step by the number of remaining steps.

```bash
remaining_steps=$((total_steps - completed_count))
projected_remaining=$(echo "$avg_cost * $remaining_steps" | bc -l)
projected_total=$(echo "$total_spent + $projected_remaining" | bc -l)
```

**Formula:**
```
projected_remaining = avg_cost × remaining_steps
projected_total     = total_spent + projected_remaining
```

**Step counts by workflow type:**
| Workflow | Total Steps | Example Phases |
|----------|-------------|----------------|
| embrace  | 4           | Discover, Define, Develop, Deliver |
| research | 3-7         | Per-agent probe count |
| review   | 3           | Fleet, Verifier, Synthesis |
| debate   | 3           | Opening, Rebuttal, Synthesis |

---

## Step 4: Display in HUD

Format the cost projection for the HUD/statusline display.

**Standard display:**
```
💰 Spent: $2.40 | Est. remaining: $3.60 | Total: ~$6.00
```

**Format rules:**
- All dollar amounts to 2 decimal places
- Projected total prefixed with `~` to indicate estimate
- Use `💰` prefix for the cost line
- Show in a single compact line for statusline integration

**When insufficient data (< 2 steps):**
```
💰 Spent: $0.42 (need 2+ steps for projection)
```

**Integration:** This display line is emitted by the octopus-hud hook and rendered in the statusline alongside phase progress and provider status.

---

## Step 5: Budget Ceiling Warning

If the `OCTO_BUDGET_CEILING` environment variable is set, compare the projected total against it and warn on overrun.

```bash
if [[ -n "${OCTO_BUDGET_CEILING:-}" ]]; then
  ceiling="$OCTO_BUDGET_CEILING"
  if (( $(echo "$projected_total > $ceiling" | bc -l) )); then
    overage=$(echo "$projected_total - $ceiling" | bc -l)
    echo "⚠️ Budget ceiling: \$$ceiling — projected to exceed by \$$overage"
  fi
fi
```

From mhdxbilal/Ai, MIT.

More from mhdxbilal/Ai

Signals

Stars
1
Forks
0
Open issues
1
Last commit (this folder)
May 19, 2026 (5 months ago)

From GitHub (fetched Oct 24, 2026).

Details

License
MIT
First seen
Oct 24, 2026
Last checked
Oct 24, 2026

Same skill elsewhere

Copies of this SKILL.md published by others; search shows only one of them.

More from mhdxbilal

Done for you

Rather not set it up yourself?

Chalk Labs scopes, builds and runs agents for your team: the task audit, the eval harness, the integrations and the weekly ops report. Fixed scope, priced before we start.

See how we build AI agents →Read the case studies

Chalk Labs is a two-founder AI and growth studio. We build AI agents, CRMs and MVPs for Web3 and AI companies, and have shipped 50+ product and token launches.

launches shipped
50+
launches shipped
media placements
500+
media placements
founders on every account
2
founders on every account

Press we've placed: Forbes · CoinDesk · Decrypt · Cointelegraph · The Block

Rahil Jain, Co-founder, Chalk Labs. Ex-Goldman Sachs engineer. You talk to the person who builds it.

Get skill-cost-projections running in your business

Tell us what you want to automate. A founder replies within one working day with a plan, not a pitch deck.

Goes to the Chalk Labs founders, not the newsletter. Privacy

Need help deploying skill-cost-projections?

CallGet help
Cite this page

skill-cost-projections. Agent Mart. https://agentmart.dev/skills/mhdxbilal-skill-cost-projections (last updated 2026-10-24)