Skip to content
Agentmart
Submit a tool
This entry duplicates 37signals-way, which is the one we list in search.

37signals-way

Build lean, opinionated products using the 37signals philosophy from "Getting Real", "Rework", and "Shape Up".

Skill by wondelai

IndexedMIT
Write a review

Install

Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.

npx agentmarket install skill/devrik99-37signals-way

Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.

Get the weekly diff

The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.

We use your email only for this newsletter. Privacy

About

Build lean, opinionated products using the 37signals philosophy from "Getting Real", "Rework", and "Shape Up". Use when the user mentions "Getting Real", "Rework", "Shape Up", "37signals", "Basecamp method", "six-week cycles", "fixed time variable scope", "appetite vs estimates", "betting table", "breadboarding", "fat marker sketch", "build less", "underdo the competition", "opinionated software", "we have too many meetings", "how do we ship faster", or "stop overbuilding". Also trigger when cutting scope to ship sooner, running a small team, or avoiding long-term roadmaps. Covers shaping, betting, building, and the art of saying no. For MVP validation, see lean-startup. For design sprints, see design-sprint.

Use cases: design

No reviews yet. Installed it? Reviews come from verified installers only. How reviews work

Permissions: not checked yet.

What's inside

Skill name
37signals-way
Description
Build lean, opinionated products using the 37signals philosophy from "Getting Real", "Rework", and "Shape Up". Use when the user mentions "Getting Real", "Rework", "Shape Up", "37signals", "Basecamp method", "six-week cycles", "fixed time variable scope", "appetite vs estimates", "betting table", "breadboarding", "fat marker sketch", "build less", "underdo the competition", "opinionated software", "we have too many meetings", "how do we ship faster", or "stop overbuilding". Also trigger when cutting scope to ship sooner, running a small team, or avoiding long-term roadmaps. Covers shaping, betting, building, and the art of saying no. For MVP validation, see lean-startup. For design sprints, see design-sprint.
License
MIT
Metadata
author: wondelai · version: 1.3.0
Instructions
182 lines in SKILL.md · view on GitHub

Files (8)

  • SKILL.md
  • betting-cycles.md · references/
  • build-less.md · references/
  • case-studies.md · references/
  • opinionated-software.md · references/
  • shaping-work.md · references/
  • small-teams-execution.md · references/
  • ux-ui-copy.md · references/

SKILL.md (first lines)

# The 37signals Product Development Framework

A system for building profitable software without bloat, bureaucracy, or burnout, distilled from three books: *Getting Real* (build less), *Rework* (say no by default), and *Shape Up* (fix time, flex scope). Use it to shape work, bet on six-week cycles, run small autonomous teams, and ship on a predictable cadence.

## Core Principle

**Build less.** The best products do fewer things exceptionally well — simplicity is the destination, not the starting point. Traditional development adds; the 37signals way subtracts: build half a product (not a half-assed product), say no by default, fix the time and flex the scope. Constraints are what make great work possible — six weeks, three people, and a shaped pitch force you to find the essential version.

## Scoring

**Goal: 10/10.** Rate product plans, feature scopes, and team processes 0-10 against these principles. Report the current score and the specific changes needed to reach 10/10.

- **9-10:** Fixed-time cycles, shaped pitches, small teams, no backlog, opinionated defaults, clear copy
- **7-8:** Mostly shaped work and small teams, but some scope creep or process overhead
- **5-6:** Some shaping happens, but backlogs persist, teams are too large, or preferences replace decisions
- **3-4:** Heavy process (standups, sprints, story points) with occasional simplicity efforts
- **0-2:** Feature factory: long-term roadmaps, large teams, estimation rituals, no shaping

### 1. Build Less, Underdo the Competition

**Core concept:** Win through deliberate omission — fewer features, fewer preferences, fewer moving parts, each done better than competitors do theirs. Build software you need yourself and solve problems you understand deeply.

**Why it works:** Every feature carries maintenance, cognitive, and opportunity costs forever, usually for a fraction of users. Building less keeps the product focused, the codebase manageable, and the team small.

**Key insights:**
- Half a product beats a half-assed product — do a few things well, not many things poorly
- Be a curator, not a hoarder: say no to good ideas so the great ones can breathe
- Make tiny decisions — big ones are hard to make and hard to reverse; small ones build momentum
- Underdo the competition: let them build the Swiss Army knife while you build the steak knife
- Focus on what won't change — speed, simplicity, reliability, ease of use

**Product applications:**

| Context | Application | Example |
|---------|-------------|---------|
| **Feature prioritization** | Default answer is no | Reporting dashboard requested → ship CSV export covering 90% of use cases |
| **MVP scoping** | Cut until it hurts, then cut more | Drop user accounts for v1; use email magic links |
| **Competitive strategy** | Underdo, don't outdo | Competitor has 50 integrations; ship 3 that work flawlessly |

See [references/build-less.md](references/build-less.md) when deciding what to cut — curation tactics, the constraints-as-feature argument, and worked scope-cut examples.

### 2. Shaping the Work

**Core concept:** Before work reaches a team, a senior person who bridges product and technical worlds makes it rough (room to maneuver), solved (main elements figured out), and bounded (scope limited by appetite).

**Why it works:** Raw ideas waste team time; detailed specs turn teams into ticket-takers. Shaping removes the biggest unknowns while leaving design freedom, and appetite ("how much time is this worth?") replaces estimation ("how long will this take?") — bounded investment instead of open-ended commitment.

**Key insights:**
- A shaped pitch has five elements: problem, appetite, solution, rabbit holes, no-gos
- Breadboard flows as places, affordances, and connections — structure without visual design
- Fat marker sketches keep abstraction high; wireframes invite pixel-level feedback before the concept is validated
- Rabbit holes (scope-blowing risks) get addressed in the pitch, not during the build
- No-gos make boundaries visible, preventing scope creep before it starts

**Product applications:**

| Context | Application | Example |
|---------|-------------|---------|
| **Feature design** | Breadboard before mockup | "Invite teammate": Settings → invite form → email sent → accept link → dashboard |
| **Scope definition** | Set appetite first | "A 2-week appetite problem, not a 6-week one" shapes which solution fits |
| **Risk management** | Call out rabbit holes upfront | "Permissions could get complex — limit to owner/member for v1" |

**Ethical boundary:** Set appetites that reflect the problem's genuine value — never artificially small to pressure teams.

See [references/shaping-work.md](references/shaping-work.md) when drafting a pitch — the five-element pitch format, a worked breadboard, fat-marker rules, the rabbit-hole pattern table, good/bad no-go examples, and a 6-step shaping procedure.

### 3. Betting and Cycles

**Core concept:** Replace backlogs and roadmaps with a betting table: senior stakeholders bet shaped pitches into six-week cycles, separated by two-week cool-downs. Unfinished work hits the circuit breaker — it does not automatically continue.

**Why it works:** Backlogs grow forever, create false progress, and dilute focus; limited cycle slots force real prioritization. The circuit breaker kills zombie projects, and cool-downs prevent the burnout of continuous sprinting.

**Key insights:**
- Abolish the backlog — if an idea is important, it will come back
- Six weeks is long enough for meaningful work, short enough to feel the deadline
- Variable scope: teams cut non-essential scope to hit the fixed deadline, never the reverse
- Plan one cycle at a time — long-term roadmaps are stale commitments
- Most pitches don't get bet on, and that's healthy

**Product applications:**

| Context | Application | Example |
|---------|-------------|---------|
| **Roadmap replacement** | Bet each cycle | 3-4 shaped pitches every 6 weeks instead of a 12-month roadmap |
| **Risk management** | Circuit breaker kills zombies | 70% done at week 6? It doesn't ship — re-shape and re-bet if it still matters |
| **Capacity planning** | Cool-down between cycles | Two weeks for bugs, tech debt, exploration, recovery |

**Ethical boundary:** Apply the circuit breaker honestly — to kill zombies, not politically inconvenient projects; the point is focus, not unsustainable pressure.

See [references/betting-cycles.md](references/betting-cycles.md) when running a betting table or planning a cycle — how the table decides, structuring the six-week/two-week rhythm, applying the circuit breaker, and the case against backlogs.

### 4. Small Teams and Execution

**Core concept:** Three-person teams (one designer, one or two programmers) work a shaped pitch autonomously — no standups, no PMs hovering. They discover their own tasks and track progress on hill charts.

**Why it works:** Three people can have a conversation; ten need a meeting. Teams that discover tasks from a shaped pitch develop real problem understanding, and hill charts tell the truth: uphill = still figuring out, downhill = executing known work.

**Key insights:**
- Scopes replace tasks — group related work into named slices that move independently on the hill
- Meetings are toxic: write it up instead
- Get real: working HTML with real data on day 2 beats a Figma mockup on day 5
- Launch now, iterate later — software in users' hands beats plans in a deck
- Design and programming integrate from day one — no handoff phases

**Product applications:**

| Context | Application | Example |
|---------|-------------|---------|
| **Team structure** | Three people max, no PM | One designer + two programmers per 6-week bet |
| **Progress tracking** | Hill charts, not burndowns | "Invitations" uphill (permissions unclear); "Email templates" downhill (executing) |
| **Communication** | Async-first, write it up | A written update or 5-minute video instead of a 30-minute meeting |

**Ethical boundary:** Autonomy requires genuinely manageable scope — if a team consistently works overtime to hit six weeks, fix the shaping, not the team.

See [references/small-teams-execution.md](references/small-teams-execution.md) when a team is mid-build — reading and updating hill charts, slicing scopes, async communication norms, and getting real with working HTML.

### 5. Opinionated Software and Clear Communication

**Core concept:** Great software makes choices instead of burying users in preferences — every preference is a decision the team could not or would not make. The same honesty applies to copy: say what you mean, skip buzzwords, teach what you know openly.

From DevRik99/forge-mcp, MIT.

Signals

Stars
0
Forks
0
Open issues
0
Last commit (this folder)
Aug 29, 2026 (2 months ago)

From GitHub (fetched Oct 24, 2026).

Details

Version
1.3.0
License
MIT
First seen
Oct 24, 2026
Last checked
Oct 24, 2026

Same skill elsewhere

Copies of this SKILL.md published by others; search shows only one of them.

More from wondelai

Cite this page

37signals-way skill. Agent Mart. https://agentmart.dev/skills/devrik99-37signals-way (last updated 2026-10-24)