Skip to content
Agentmart
Submit a tool
This entry duplicates develop-tdd, which is the one we list in search.

develop-tdd

Test-driven development with red-green-refactor loop using vertical slices.

Skill by danielvm-git

IndexedMIT★ 271
Write a review

Install

Works with Claude Code, Claude apps, Codex, Cursor, Gemini CLI, GitHub Copilot, VS Code, OpenCode, Goose, Windsurf. Read the repository before you give any tool access to your data.

npx agentmarket install skill/danielvm-git-develop-tdd-03f78a

Asks which of your tools to add it to (Claude Code, Codex, Cursor, VS Code, Windsurf, Gemini CLI, Claude Desktop) and shows the change first. See https://agentmart.dev/cli.

Get the weekly diff

The weekly diff: one email a week with new agent tools, notable updates and grade changes, plus security alerts for tools you follow. Double opt-in, one-click unsubscribe.

We use your email only for this newsletter. Privacy

About

Test-driven development with red-green-refactor loop using vertical slices. Use for features (epic tasks) or bugs (specs/bugs/BUG-*.md).

Use cases: testing, agent-building

No reviews yet. Installed it? Reviews come from verified installers only. How reviews work

Permissions: not checked yet.

What's inside

Skill name
develop-tdd
Description
Test-driven development with red-green-refactor loop using vertical slices. Use for features (epic tasks) or bugs (specs/bugs/BUG-*.md).
License
MIT
Instructions
412 lines in SKILL.md · view on GitHub

Before installing

  • Instructions call the network

Files (1)

  • SKILL.md

SKILL.md (first lines)

# Develop TDD

> **HARD GATE** — Do NOT proceed if on `main` or `master`. Run `kickoff-branch` first to create a feature branch or worktree.
>
> **HARD GATE** — Do NOT write code before you have a plan. New feature: `plan-work` → epic capsule tasks. Bug: `investigate-bug` → `specs/bugs/BUG-*.md` (or use `fix-bug` orchestrator).
>
> **RECURSIVE DISCIPLINE** — This lifecycle applies to EVERY task, including updating these skills. Never skip planning because a task is "meta" or "just documentation."

## Philosophy

Tests verify behavior through public interfaces, not implementation details. A good test reads like a specification. See [REFERENCE.md](REFERENCE.md) for the horizontal-slice anti-pattern and TDD phase detail.

## Red Flags

If you catch yourself thinking these, stop and reconsider — you are likely deviating from production-grade craft.

| Red Flag | Reality |
| :--- | :--- |
| "This is too simple to need tests." | Simple code is where bugs hide. If it's simple, the test is cheap. |
| "I'll refactor this later." | "Later" is when technical debt becomes bankruptcy. Refactor while Green. |
| "The tests are already comprehensive." | If you're adding behavior, you need a new test. Coverage ≠ Correctness. |
| "I'm just fixing a small bug." | Small bugs often indicate deep interface flaws. Investigate root cause. |
| "I need to mock this internal class." | Mocking internals couples tests to implementation. Mock only I/O. |
| "This refactor is out of scope." | Leave the code cleaner than you found it (Boy Scout Rule). |
| "Preflight failed but it's unrelated." | **Always Green:** any reproducible gate failure routes **quick-fix → fix-bug** before forward work. Session boundaries do not waive Preflight. |
| "I'll note the red gate and continue." | Narrating a failure is banned. fix-or-log is mandatory per CONVENTIONS § Discovered Defects. |

## Workflow

> **Timing:** `bash scripts/bp-timing.sh start develop-tdd` at invocation; `bash scripts/bp-timing.sh end develop-tdd` before handoff.

### 1. Planning

- [ ] Read active `specs/epics/*/epic.yaml` story tasks or `specs/bugs/BUG-*.md` — understand verify steps
- [ ] If `specs/tech-architecture/eNN-TEST_PLAN_LATEST.md` exists for the active epic, read it before writing the first test. Implement P0 scenarios (`SC-*-P0-*`) before P1. P2/P3 scenarios are optional per time budget.
- [ ] Confirm interface changes and behaviors to test (prioritize)
- [ ] Design interfaces for testability — identify [deep modules](deep-modules.md) opportunities
- [ ] Get user approval on the plan

Apply the **enforce-first** F.I.R.S.T rubric: Fast, Independent, Repeatable, Self-Validating, Timely.

### 2. Tracer Bullet

Write ONE test that confirms ONE thing about the system:

```
RED:    Write test for first behavior → test fails → commit: test(<scope>): ...  (test-only; red in CI)
GREEN:  Write minimal code to pass → test passes → commit: feat(<scope>): ...   (fix commit; green)
REFACTOR (optional): clean up → commit: refactor(<scope>): ...
```

> **Two-commit red/green policy (HARD GATE — e45s08)** — Each behavior cycle requires **two separate commits**: (1) test-only commit that fails in CI (RED), then (2) implementation commit that makes it pass (GREEN). Never combine test + fix in one commit. Before proceeding, run the mechanical RED isolation check:

```bash
bash scripts/verify-tdd-red-commit.sh
```

Show `git log -2 --oneline` **and** the script output as evidence. If the test-only commit passes in isolation, the RED gate is violated — stop and fix before GREEN.

> **tasks.yaml ledger (e45s06)** — After each task's `verify:` exits 0, update `eNNsYY-tasks.yaml`: set that task's `status: passing`. Story-level `status: passing` only when all tasks pass.

### 3. Incremental Loop

> **Snapshot-before-transition (e45s34):** Before each RED → GREEN or GREEN → REFACTOR transition, create a checkpoint so a failed transition can be rolled back cleanly:

```bash
bash scripts/bp-yaml-snapshot.sh specs/state.yaml   # if state changed this cycle
git stash push -m "tdd-checkpoint-$(git rev-parse --short HEAD)-red" --keep-index 2>/dev/null || true
```

After GREEN passes and is committed, drop the stash (`git stash drop` if empty). Never refactor while RED.

For each remaining behavior: RED → GREEN → REFACTOR (optional). One test at a time. **Two commits per behavior** (test-only RED, then fix GREEN). Commit after every GREEN phase.

### 4. Visual Slices (UI alternate workflow)

For UI components where behavioral unit testing is brittle: extract logic into a Controller/ViewModel/Hook (pure TDD), then use Visual Slices for the View layer. See [REFERENCE.md](REFERENCE.md) for the full Visual Slices procedure.

### 5. Refactor

After all tests pass: extract duplication, deepen modules, apply SOLID principles. **Never refactor while RED.**

### 6. Verify

After every behavior cycle, run the verify command from the active epic task. Show evidence before declaring the step done.

### 7. Manual Verification Handover

Once all tests pass: locate the Verification Script in the active epic capsule, present it to the user step-by-step, and wait for confirmation of behavioral correctness.


### 6a. CI dry-run sub-step

If this cycle modified files in `.github/workflows/`, run the CI dry-run procedure documented in [REFERENCE.md](REFERENCE.md#ci-dry-run).

## Checklist Per Cycle

```
[ ] Test describes behavior, not implementation
[ ] No test is ignored without an explicit ambiguity note (T4)
[ ] Boundary conditions tested: empty, max, min, off-by-one (T5)
[ ] Tests verify behavior through public interface only — no private methods (T8)
[ ] Test would survive internal refactor
[ ] Code is minimal for this test
[ ] No speculative features added
[ ] Every new abstraction has an explicit "Reason for Depth" justification
[ ] Progress committed (Conventional Commits)
[ ] verify: command passes
```



## Handoff

Gate: READY -> next: verify-work
Writes: state.yaml handoff.next_skill = verify-work

## BCP Plus Integration

From danielvm-git/bigpowers, MIT.

More from danielvm-git/bigpowers

Signals

Stars
271
Forks
24
Open issues
11
Last commit (this folder)
Jul 25, 2026 (3 months ago)
Last release
Sep 21, 2026 (1 month ago)

From GitHub (fetched Oct 24, 2026).

Details

License
MIT
First seen
Oct 24, 2026
Last checked
Oct 24, 2026

Same skill elsewhere

Copies of this SKILL.md published by others; search shows only one of them.

More from danielvm-git

Cite this page

develop-tdd skill. Agent Mart. https://agentmart.dev/skills/danielvm-git-develop-tdd-03f78a (last updated 2026-10-24)